Help validate PIP on a real industrial project.
PIP is currently in Beta. The platform is in active development and validation for engineered-to-order manufacturing and industrial fabrication.
Active Beta Development
Core product work and internal validation.
Partner Demonstrations
A demonstration-ready build is planned.
Pilot Refinement & Configuration
Feedback and workflow preparation with prospective partners.
Pilot-Ready Release
Target for selected customer projects to begin.
What a pilot could look like
Start narrow. Learn from real work. Expand only when value is clear.
The preferred initial pilot is one representative industrial project—such as a tank, vessel, skid, equipment package or comparable scope—with selected users, agreed workflows and information sources, and success measures defined before work begins.
One project
A representative, bounded project scope rather than an enterprise-wide rollout.
Selected users
Participants from the roles needed to test the agreed workflow.
Defined measures
Practical success criteria based on capture, retrieval and visibility.
Controlled expansion
Additional scope only if the initial workflow demonstrates value.
Candidate pilot workflows
Select the project context that matters most.
Candidate scope may include the following items. Final pilot scope would reflect product readiness, partner priorities and the information approved for use.
Project foundation
Project setup, identity, equipment, assemblies and components.
Engineering context
Selected engineering information and drawing/document relationships.
Fabrication visibility
Progress updates, recent activity and project history.
Quality events
Issues, NCRs, QA/QC records and inspection events.
Management attention
Changes, blockers, risks and items requiring attention.
Ask PIP retrieval
Practical project questions answered from approved connected information.
How success would be evaluated
Qualitative evidence from the workflow—not invented ROI.
Information capture
Users can enter updates and PIP records them with appropriate project context, source, time and history.
Retrieval
Users can ask practical questions and trace answers to known project information.
Cross-functional access
Authorized non-CAD roles can reach relevant engineering and project information.
Engineering connection
Selected engineering information can be synchronized reliably where included in pilot scope.
Management visibility
Project briefings surface progress, issues, changes and required attention.
Who we want to hear from
Industrial teams willing to test the problem honestly.
We want to hear from engineered-to-order manufacturers and industrial fabricators interested in practical product feedback, evaluation against a representative workflow, and a controlled 2027 pilot.
Status clarity
This is an invitation to shape the product—not a claim of finished deployment.
PIP is not presented as externally demo-ready in October 2026, and January pilot projects are targets rather than contracted engagements.
Discuss a Pilot Project